Cosmetic Refresh
Layout stays the same. New countertops, cabinets, backsplash, flooring, lighting, appliances. No walls move.
Starting with what’s behind the cabinets. From cosmetic refreshes to full gut remodels with structural modifications — one team, one contract.
Scope & Investment
Layout stays the same. New countertops, cabinets, backsplash, flooring, lighting, appliances. No walls move.
Layout gets refined. Island addition, minor wall removal, semi-custom cabinets, premium countertops, new lighting plan.
Everything comes out. Load-bearing wall removal, complete electrical and plumbing replacement, custom cabinetry, premium finishes.
The Structural Question
The most common request: "Can we take out the wall between the kitchen and the living room?" Usually, yes — but it's not as simple as swinging a sledgehammer.
That wall likely carries ceiling joists and roof structure. A structural engineer designs the replacement beam.
LVL beam or steel flitch plate sized to carry the load across the new open span, with posts at each end.
Posts need to transfer load to the foundation. Existing footings may need reinforcement.
We frame the opening, install the beam, reinforce posts, and make it look like the beam was always there.
Budget Guide
Floors, shower walls, tub surround. Ceramic ($5–15/SF), Porcelain ($10–25/SF), Natural stone ($20–60+/SF). Install adds $8–20+/SF.
Laminate ($30–$50/SF), Quartz ($75–$125/SF), Natural stone ($100–$200+/SF)
Mid-range package $5K–$12K. Premium (Wolf, Sub-Zero) $20K–$40K+
Demolition, framing, electrical, plumbing, tile, installation, project management
Flooring, tile, lighting, fixtures, and Peninsula permit fees
Our Process
Visit kitchen, assess structure, review electrical/plumbing adequacy. Clear understanding of scope and realistic cost.
Kitchen plan reflecting structural assessment. Layout, cabinet configuration, finish selections, appliance placement.
Submit to local building department. Manage plan check in Pacifica, Daly City, SSF, San Bruno, SF.
Demo, structural mods, rough-in, insulation, drywall, flooring, cabinets, countertops, tile, fixtures, appliances.
Final inspections, punch list walkthrough, cleanup. 4–8 weeks cosmetic, 10–16 weeks structural.
Why ACI
Load-bearing wall removal, beam installation, framing — one crew from demo through completion.
Galvanized plumbing, undersized electrical, asbestos, missing insulation — we plan for it during scoping.
One contract, one point of contact, one schedule. No gap between plans and construction.
188 Clarendon Road, Pacifica. We know the permitting processes and housing stock.
CSLB #1041528
Licensed GC — Class B
Bonded & Insured
Family-Owned
Service Area
Our home base — we know these homes and this planning department better than anyone.
Victorian and Edwardian kitchens with unique structural and permitting challenges.
1950s–60s housing stock with the galvanized plumbing and undersized electrical we specialize in.
Post-war homes ready for modern kitchen layouts and open-concept conversions.
Suburban mid-century homes with room for kitchen expansions and structural upgrades.
Plus Brisbane, Colma, Half Moon Bay, and the Coastside. Contact us to discuss your project.