CSLB #1041528 — Family-Owned, Pacifica-Based

Bathroom Remodeling on the Peninsula.

The room where everything behind the tile matters most. From fixture updates to full gut remodels — including plumbing replacement, layout reconfiguration, and adding a second bath — for Peninsula homeowners dealing with outdated postwar bathrooms. One team, one contract.

What’s Behind the Tile

What We Find Inside Peninsula Bathrooms

In a 1950s or 1960s Peninsula home, original bathrooms have been performing for over half a century. Here’s what we find when we open them up.

  • Plumbing That’s Aging Out

    Galvanized supply lines corroding from inside. Cast iron drains with interior scaling. Toilet flanges corroded after 60 years.

  • Waterproofing That Doesn’t Exist

    Many 1950s bathrooms tiled directly on drywall without any membrane. Moisture migrates into wall cavity and framing.

  • Electrical That Doesn’t Meet Code

    One circuit, no GFCI. Current code requires GFCI receptacles, dedicated circuits, and ducted exhaust ventilation.

  • Ventilation That Goes Nowhere

    Exhaust fan vents into attic instead of exterior. Promotes mold growth on roof sheathing.

Scope & Investment

Three Levels of Bathroom Remodel

Remodeling two or more bathrooms? Per-bathroom cost decreases — trades already mobilized. A two-bathroom project typically costs 1.6–1.7x one bathroom, not 2x.

Most Requested

The Tub-to-Shower Conversion

The most frequently requested modification in Peninsula bathroom remodels.
  • Drain Relocation

    Tub drain at one end; shower drain needs centering. On slab-on-grade homes, means cutting into concrete.

  • Shower Pan Construction

    Floor must slope quarter-inch per foot to drain. Waterproofed continuously from floor up walls.

  • Valve & Showerhead Placement

    Set during rough-in, permanent once tile is installed. Must be planned in design phase.

  • Glass Enclosure Blocking

    Solid wood backing installed during framing at hinge and support points. Must be done before tile.

Budget Guide

Where Your Bathroom Budget Goes

Tile

20–25%

Floors, shower walls, tub surround. Ceramic ($5–15/SF), Porcelain ($10–25/SF), Natural stone ($20–60+/SF). Install adds $8–20+/SF.

Vanity & Counter

15–20%

Prefab ($500–$3K), Semi-custom ($3K–$8K), Custom wall-to-wall ($8K–$15K+)

Plumbing

15–20%

Supply replacement, drain repair, fixture rough-in. Moving plumbing increases significantly.

Labor

35–45%

Highest labor-per-square-foot of any room. Demo, framing, plumbing, electrical, waterproofing, tile, fixtures.

Fixtures & Permits

10–15%

Toilet ($300–$1,500), shower valve ($300–$1,200), exhaust fan, accessories, permits.

Our Process

From Assessment to Completion

  • Assessment

    Evaluate plumbing age, ventilation, moisture damage. Tell you what to expect behind tile based on era.

  • Design

    Plan accounting for what’s behind walls. Tile, fixture placement, vanity, lighting, plumbing routing.

  • Permitting

    Required for plumbing relocation, electrical additions, structural modifications.

  • Construction

    Demo, framing, plumbing rough-in, electrical, waterproofing, tile, vanity, fixtures, painting.

  • Completion

    Final connections, glass installation, punch list, cleanup, inspection sign-off.

Cosmetic refresh: 2–4 weeks. Mid-range gut: 4–8 weeks. Full gut with layout changes: 6–12 weeks.

When One Bathroom Leads to More

You open one bathroom and find galvanized plumbing — which means the whole house has it. The guest bath has the same vintage tile, the same lack of waterproofing, the same undersized electrical. Once you see what’s behind the walls, the question shifts from “should we do the other bathrooms?” to “when?”

You can do one bathroom now and others later. Or you can combine bathrooms with a kitchen remodel or whole-home renovation and take advantage of trades already on site.

Because ACI handles all of these scopes, we can scale the project to match your timeline and budget.

Why ACI

Why Peninsula Homeowners Choose ACI

We focus on what’s behind the tile

Waterproofing, plumbing replacement, ventilation, electrical — primary scope items, not afterthoughts.

We handle plumbing and framing directly

Our crew does rough-in plumbing and framing modifications. No waiting on separate subcontractors for critical path work.

Design-build eliminates coordination gaps

Design, plumbing routing, tile layout, glass blocking — managed by one team. Nothing falls between the cracks.

We know Peninsula bathrooms

Galvanized lines, no waterproofing membranes, cast iron drains, attic-vented fans. We’ve seen it all.

Licensed & Insured

CSLB License #1041528 (General Building, Class B)

Service Area

ACI Remodels Bathrooms Throughout the Peninsula

  • 📍

    Our home base. 1950s–60s homes with original plumbing and bathrooms tiled on bare drywall.

  • 📍
    South San Francisco

    Post-war housing with galvanized supply lines and cast iron drains ready for replacement.

  • 📍
    San Francisco

    Victorian and mid-century bathrooms with outdated plumbing and zero waterproofing.

  • 📍
    San Bruno & San Mateo

    Suburban homes with aging bathrooms and homeowners ready for modern upgrades.

  • 📍
    Daly City

    Dense Westlake-era homes with compact bathrooms in need of gut remodels.

  • 📍
    Burlingame, Millbrae & More

    Plus Brisbane, Colma, Half Moon Bay, and the Coastside. Contact us to discuss your bathroom project.